There is normally enough wiggle room here to close or open the gap from 3mm to space out slates in their horizontal axis when first laying out a slate roof for adjustment purposes.
Setting out slate roof tiles.
Choose from single color slate or from multi colored tiles with warm reds and golds over a darker background.
Just sweep or vacuum a slate floor regularly.
So when repairing or replacing these roofs prolong the life of the installation by using heavy underlayment 30 lb.
Setting out up the roof gauge set the first batten at eaves to allow the tails of the eaves course tiles to overhang the fascia by 40 to 45mm ie.
Then determine the position of the highest batten at the top typically the top of the uppermost row of slates tiles.
Margin this is the visible or exposed area of a slate from the bottom or tail of one slate up to the point the slate above overlaps it.
Cut the second under eaves course from the same slate as the first course.
Building paper or self adhering bituminous membrane copper attachers and copper flashing.
Locate the centre point of the eaves and centre the first under eaves slate.
Plus slate is an extremely durable flooring material that requires very little maintenance and does a nice job of disguising dirt.
Set the last batten at the ridge so that the ridge tiles will overlap the top course of tiles by at least 75mm.
Just short of the centre of the gutter.
How to slate a roof http www fixmyroof co uk videos and guides pitched roof slate a roof this video shows you the basics of how to set out a roof for slat.
Position the first roll of underlayment at one side of the roof perpendicular to the lower edge the eave of the roof.
Alternatively you could use a 12 inch high starter slate thereby guaranteeing a 3 5 inch headlap on the starter course and an 8 5 inch exposure on all field slates.
Lay the first full slate over the top of this under eaves slate and cut the slates on both verges to the same width.
Slate and tile are so durable that they often outlast the underlayment and fasteners.
Measure between the top of the top batten and the top of.
As you roll out the underlay keep the bottom edge of the material aligned with the edge of the eave but above any metal or synthetic edging that may cover the borders of the eave.
Work towards both verges with the remaining under eaves slates.